New Retail Project!
WCD is just getting started on another Walmart store (1600) in Ridgecrest, Ca. This is our third project with Eleven Western Builders.
WCD is just getting started on another Walmart store (1600) in Ridgecrest, Ca. This is our third project with Eleven Western Builders.
WCD just signed a contract with Emmerson Construction out of San Diego to provide drywall finish for the Mill Creek Village senior apartment project. This project will start later this Continue Reading →
WCD is onsite in Tehachapi Ca. building a living space with metal studs in an airplane hanger. This is so cool for us to get to work on a design Continue Reading →
WCD is installing a shaftwall system in the five story Hampton Inn in Hollywood Ca. These systems are interior nonload-bearing gypsum panel partitions designed to construct elevator shafts, mechanical shafts, stairwells, Continue Reading →
WCD is using 25 GA furring channels attached to metal stud members suspended by drop supports at our Hampton Inn project in Hollywood Ca. . We frequently use this type of Continue Reading →
WCD is currently plastering the Aldi Market #92 in Bakersfield, Ca. This project is approx. 1200 yards of commercial 3 coat stucco with a sanded elastomeric finish over metal lath, Continue Reading →
WCD has just signed a contract with Pacific West Builders to provide drywall finish for a 40 unit senior apartment building in Coalinga, Ca.
WCD has begun metal stud framing on a five story 103 room Hampton Inn hotel on Vine Street in Hollywood California.
WCD is installing resilient channels at Arroyo del camino apts. (RC-1 Pro) is one of the most effective, low-cost methods of decreasing sound transmission at wood and steel frame partitions. It can Continue Reading →
WCD has just finished another OSHPOD project at Bakersfield’s Memorial Hospital. We were subcontracted by S C Anderson to perform the metal studs and drywall for this 12,000 square feet Continue Reading →
WCD is on site at the new Walmart going up in Wasco, Ca. We are installing 4800 SF of abuse resistant drywall (ARD) at the sales floor area’s to 4′ Continue Reading →
WCD is installing Exterior Glass Mat. Sheathing (EGM) at our Vandenberg Air Force Base project. EGM integrates a water-resistant, treated core with a fiberglass mat face and back to provide Continue Reading →
Our plaster team has 25 years experience and is ready to install any type of finish you require, including foam shapes, coatings and liquid applied barriers. Save
This is one of our crews building a 6″ exterior metal stud curtain wall for an industrial facility in Bakersfield, Ca. (TCI Tire Warehouse)
“WCD is the perfect construction partner for hotel projects in California. We use our 20 years of product knowledge to work with builders and architects to reduce project costs thru value engineering, maximizing productivity and great partnerships Continue Reading →
WCD has a division that can provide drywall services for: Hotels Apartments Senior Housing Facilities Podium Apartment Buildings Assisted Living/Memory Care Facilities We are marketing these drywall services to southern Continue Reading →