The Terraces at Nevin – Richmond California

Posted on 10/01/2018 by admin

The Terraces at Nevin

Construction of a six story, 67 foot high, 289 unit apartment complex consisting of two buildings.
The project (both buildings) would have a total floor area of
approximately 350,000 square feet, including residential space, common spaces, and parking.
Posted in Blog, Drywall Projects, Metal Stud Framing, Multi Family, Prep Coat, Taping, Texture

Post navigation

← Southern Cal Gas Bakersfield Base Building
WEST COAST DRYWALL CONSTRUCTION INC TEAM – XMAS 2018 →

Categories

  • Blog
  • Drywall Projects
  • EFIS and Stucco Projects
  • Interior Veneer Plaster
  • Metal Stud Framing
  • Metal Trusses
  • Multi Family
  • Prep Coat
  • SureBoard
  • Taping
  • Texture
  • Wood Framing

Archives

  • September 2022
  • May 2021
  • August 2020
  • November 2019
  • December 2018
  • October 2018
  • September 2018
  • February 2018
  • September 2017
  • August 2017
  • June 2017
  • May 2017
  • November 2016
  • September 2016
  • August 2016
  • May 2016
  • April 2016
  • March 2016
  • February 2016
  • January 2016
  • November 2015
  • July 2015
  • June 2015
  • May 2015
  • April 2015

Footer Menu

Skip to Footer Content
Copyright © 2023 West Coast Drywall Construction Inc.. All Rights Reserved.
Powered by: West Coast Drywall